Sydney Harbour Marine · Piling
Sydney Harbour Marine provides marine piling services for residential waterfront structures across Sydney Harbour, Middle Harbour, Lane Cove River and Parramatta River.
We undertake pile replacement and new pile installation for jetties, pontoons, wharves, moorings and other waterfront structures, working with engineers, certifiers and approval consultants where required.
Opens our booking form in a new tab — close the tab to return to this website.
Marine piles deteriorate over time through marine borer attack, corrosion, impact damage, movement and long-term exposure to saltwater.
We can inspect existing piles and help determine whether repair, strengthening or full replacement is the most practical option.
Pile replacement may be required for:

Sydney Harbour Marine can install new piles as part of a new or upgraded waterfront structure.
The pile type, diameter, length and installation method depend on:
We coordinate with the appropriate engineer and approval team so that the piling works suit the final approved design.


Piles for wharves, jetties and pontoons are most commonly constructed from Turpentine timber, but may also be:
The most suitable material depends on the structure, site conditions, engineering requirements and intended service life.
Turpentine remains a common choice for Sydney Harbour because of its durability and natural resistance to marine borers.

We also undertake pile installation and replacement for:
These piles are selected and installed to suit the vessel, pontoon system and waterfront structure.

Marine piling often forms part of a larger approved waterfront project.
Depending on the scope, works may require:
Sydney Harbour Marine can coordinate the practical construction side of the project and work with trusted engineers, maritime consultants, surveyors and certifiers.

We inspect the existing structure, piles, access and site conditions.
We determine the likely scope, pile type and whether engineering or approvals are required.
Where required, the project proceeds through the appropriate TfNSW, CDC or DA pathway.
Once approved, the piles are installed using suitable marine access, plant and barge equipment.



Sydney Harbour Marine is a family-owned marine business with extensive practical experience working across Sydney Harbour.
We work with a trusted network of:
Our aim is to select the right people, materials and equipment for each waterfront project and get the work right the first time.
and surrounding Sydney Harbour waterways.
Whether you need one damaged pile assessed, multiple piles replaced or piling as part of a larger waterfront rebuild, Sydney Harbour Marine can help.